Update on $5 Million Of Enhancement Projects
(Updated Feb. 15, 2008)
  
These projects were selected by an independent seven-person panel of community leaders and approved by the Federal Energy Regulatory Commission (FERC). The panel was charged with selecting project enhancements at or near the company’s Taum Sauk Plant to receive funding from the $5 million account. In October 2006, Ameren Corporation, parent of AmerenUE, and FERC announced a stipulation and consent agreement resolving all potential federal liability associated with the failure of AmerenUE’s Taum Sauk Hydroelectric Plant. AmerenUE agreed to pay a civil penalty and to fund $5 million in project enhancements at or near the Taum Sauk facility. The projects should be completed by July 31, 2008, according to the latest FERC determination
  

PROJECT

DESCRIPTION

FUNDING

STATUS

Emergency Management System in Reynolds and Iron Counties

Implement enhanced 911 service in three counties, two of which were previously unserved; improve emergency radio communications and radio tower transmission; expand emergency operations center building; construct a new fire house; acquire two new fire trucks and a search and rescue vehicle and trailer (North Reynolds County Fire Protection District); and acquire one ambulance (Reynolds County Ambulance District)

$ 1,926,000

Two radio towers have been erected; emergency generator is installed; construction of the expanded emergency operations center is complete.

Mapping and addressing of all physical locations is complete for 911 service; emergency vehicles are on order.

Installation of telecommunications equipment is ongoing; completion is expected in the second quarter of 2008.

The firehouse is built; fire trucks are expected in spring of 2008; search and rescue vehicle and trailer have been delivered; ambulance has been delivered.

Lesterville R-IV School District

Install new roof and perform electrical repairs at Lesterville R-IV School

$ 900,000

Completed

Lesterville Water District

Install drinking water system upgrades for Lesterville, including a holding tank, a new well, and sand filter/treatment upgrades

$ 625,000

A new water storage tank has been ordered. Engineering design and water quality analysis, and coordination with the regulatory agency are under way. This project is expected to be complete in July 2008

Hospital CT Scanner

Acquire and install a CT scanner for Advanced Healthcare Medical Center in Ellington

$ 491,254

Completed

Road Construction Equipment for Reynolds County

Acquire equipment for road and bridge construction/maintenance, including a loader and two heavy duty tandem dump trucks

$ 259,500

Completed

River Valley Region Association Travel and Tourism Promotion Initiative

Develop and maintain 12 web sites that promote travel and tourism in the Arcadia Valley and Black River areas; develop visitor's guide brochure

$ 100,000

Two major web sites complete; visitor's guide under development. This project is expected to be complete in June 2008.

Arcadia Valley R-II School District

Build tennis courts and install elementary school playground equipment and outdoor lighting at schools

$ 100,000

Completed

Centerville R-I School District

Install a new school building roof, upgrade the school kitchen, install an emergency generator, and acquire supplies

$ 100,000

Completed

Ozark Trail Association

Implement and operate a Trail Shuttle Service and develop an online trip planning service

$ 75,000

Completed

Iron County Hospital

Promote healthcare services of the new Iron County Hospital through marketing and advertising projects

$ 70,000

Completed

Arcadia Valley Sports Complex

Acquire mowing and maintenance equipment, and develop the St. Francois Mountains outdoor living classroom and fitness trail

$ 50,000

Completed

Reynolds County Roads

Rebuild a low water bridge on County Road #816 in Reynolds County

$ 48,500

Completed

Reynolds County Tax Assessor

Obtain aerial photography of Reynolds County for tax assessment and emergency response initiatives

$ 38,000

Completed

Search and Rescue Canine Training Center

Build and operate a non-profit training facility for search and rescue dogs and handlers

$ 32,000

The grant applicant withdrew this project and received no funds. Funds will be applied to other approved projects.

South Iron Community Betterment Association

Purchase and install playground equipment for public play area near Annapolis Community Center

$ 30,000

Completed

Reynolds County Sheriff’s Department

Acquire a four-wheel drive patrol truck

$ 26,236

Completed

City of Bunker

Purchase and install a generator for the City of Bunker drinking water system pump house

$ 25,000

Completed

Reynolds County Sheltered Workshop

Purchase and install sewing and woodworking equipment, and upgraded electrical system for sheltered workshop

$ 25,000

Completed

Whole Health Outreach

Fund an outreach program focused on improving the health of seniors in Iron and Reynolds Counties

$ 25,000

Completed

Whistle Stop Depot

Renovate the Whistle Stop Depot in Arcadia for use as a Visitors Center and history museum

$ 20,000

Completed

South Iron County R-I School District

Develop a pavilion and concession area for athletic fields; develop a playground and hiking trail

$ 11,000

Completed

Lesterville Sewer Study

Conduct a feasibility study for a centralized sewer system to serve Lesterville

$ 10,000

Completed

South Iron Community Betterment Association

Expand and upgrade kitchen and serving facilities at the Annapolis Community Center

$ 7,500

Completed

Bunker R-III School District

Correct a water drainage problems at student-designed pavilion and picnic area

$ 5,000

Completed

CONTINGENCY PROJECT

If all other funds are not used for approved projects, then funds could be applied to:

Bunker Volunteer Fire Department

Construct a multi-bay firehouse for the Bunker Volunteer Fire Department

Not to exceed $ 150,000

Availability of funds remaining from other approved projects has not been determined.

CONTINGENCY PROJECT

Earned interest on account could be applied to:

Cellular Phone Service

Encourage improvement of cellular phone coverage near the Taum Sauk project

Interest earnings from the escrow account are to be utilized to attract a cell phone provider to expand coverage. If a cellular provider cannot be persuaded to make upgrades, funds go to the Bunker Volunteer Fire Department contingency project, up to a maximum of $150,000

Negotiations with a cellular phone service provider are ongoing.

   